BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//ACPA Pipe School - ECPv6.15.20//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-ORIGINAL-URL:https://pipeschool.org
X-WR-CALDESC:Events for ACPA Pipe School
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:UTC
BEGIN:STANDARD
TZOFFSETFROM:+0000
TZOFFSETTO:+0000
TZNAME:UTC
DTSTART:20210101T000000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=UTC:20220131T163000
DTEND;TZID=UTC:20220131T173000
DTSTAMP:20260430T183436
CREATED:20220106T222909Z
LAST-MODIFIED:20220201T035533Z
UID:1568-1643646600-1643650200@pipeschool.org
SUMMARY:Flooded Backfill
DESCRIPTION:Location:  Frisco 2 \nSpeaker:  Wes Musgrove – IowaDOT \nPresentation Description\nWhen backfilling and compaction by flooding is required\, backfill may be placed in lifts up to 2 feet thick. Place backfill simultaneously on both sides of culvert. Determine if pipe culverts need to be restrained and take appropriate actions to prevent floating of culverts during backfilling\, flooding\, and compaction. This session will cover Iowa DOT’s path to the use of flooded backfill. From recognizing pavement degradation issues at culvert crossings\, to evaluation of the cause\, to the results of the solution. Flooded backfill has provided benefits surpassing the expectation for Iowa DOT. \nSpeaker Bio\nWes holds a B.S degree in Civil Engineering from Washington State University and has 25-years of experience with the Iowa DOT\, 16-years of which have involved construction contract administration and materials-related responsibilities in the field in various capacities. Wes’ more recent experience includes 6 years as the District 1 Construction Engineer overseeing construction contract administration and materials inspection in 12 counties in central Iowa\, followed by 4 years as the Director of the Contracts and Specifications Bureau. Wes currently serves as the Director of the Iowa DOT’s Construction and Materials Bureau\, where his responsibilities as the State Construction and Materials Engineer for the past 5 years include central administrative oversight of Iowa’s $800 Million state transportation improvement program.
URL:https://pipeschool.org/session/flooded-backfill/
LOCATION:Frisco 2
CATEGORIES:In-Person,Streaming Transportation Track,Transportation
ATTACH;FMTTYPE=image/png:https://pipeschool.org/wp-content/uploads/2022/01/Pipe_School-Wes-Musgrove.png
END:VEVENT
END:VCALENDAR