Protecting Venice Beach With a New Force Main Sewer

Presenter:  Luis Santana

Organization:  Hamilton Kent

Description:  Learn how Geneva Pipe and Precast and Hamilton Kent team up to provide 1,710 linear feet of Class V precast concrete jacking pipe with O-ring gaskets for high-profile sewer line at Venice Beach.

  • L.A. Department of Public Works commissioned 54-inch force main sewer to run parallel with a 60-year old sewer line.
  • Specs called for more than 90% of the pipeline to be constructed through micro-tunneling to avoid disrupting the densely populated beach community.
  • Geneva Pipe and Precast provided 1,710 linear feet of Class V precast concrete jacking pipe and worked with Hamilton Kent on an O-ring joint design that would ensure optimal hydraulic performance and pass a 50 psi pressure requirement.
  • The 72″ jacking pipe acts as a casing pipe for the 54″ pressurized force main.
  • The final joint design consisted of a confined O-ring gasket combined with a steel bell band, which helps to disperse much of the jacking force around the pipe.

Return to the 2022 Poster Session Page